Set Up Work Area

The work area is prepared by setting up all relevant equipment for the job, including the derrick emergency escape device.

Potential Hazards

  • being struck by or caught between equipment
  • receiving strains and sprains
  • getting hand, finger, and foot injuries
  • slips, trips, and falls
  • failing to properly install derrick emergency escape device when personnel may be expected to work in the derrick
  • getting burned or exposed to respiratory hazards due to ignition of flammable liquids, vapors, and gases

Possible Solutions

  • Install guardrails as required.
  • Inspect equipment integrity such as slings, tongs, and hand tools.
  • Train crew to select and use the proper tools for the job.
  • Instruct workers to stand clear of suspended loads.
  • Use a tag line to guide equipment into position.
  • Inspect hoses and connections before and after attaching to the tongs.
  • Connect hoses after the tongs have been positioned.
  • Properly install derrick emergency escape device in accordance with manufacturer's recommendations.
  • Proper equipment type and placement.

Knowledge Check Choose the best answer for the question.

3-5. What safety precaution should be taken when someone is working in the derrick?