We're sorry, but OSHAcademy doesn't work properly without JavaScript enabled. Please turn on JavaScript or install a browser that supports Javascript.

800 Introduction to Construction Safety Management
Skip to main content

The Pre-Bid Meeting

In the pre-bid meeting, contract safety requirements should be discussed, including:

  • site specific safety plan
  • designated safety representative identification and requirements
  • daily pre-work coordination meetings
  • safety enforcement policies and procedures
  • drug screening
  • identification of potential hazards
  • defining hazard control responsibilities

Knowledge Check Choose the best answer for the question.

2-3. Which topic should be discussed in a pre-bid meeting?